What is the period of recovery for the project described below? The project aims to create a new type of paving using agro-industrial and demoliti...

What is the period of recovery for the project described below?

The project aims to create a new type of paving using agro-industrial and demolition and construction waste as filling and coating materials.
The project requires a detailed analysis of the different types and quantities of available waste, as well as an evaluation of their physical and chemical properties.
The project also considers the possible environmental impact and the aesthetic aspect and durability of the composite paving stones.
The total cost of the project is $62,350, and the expected income is $40,000 from the sale of approximately 20,000 composite paving stones.
The period of recovery for the project is 1.6 years.